Deck fittings
-
There is a high bulwark around the side deck
-
Hakorit rub rail around the ship and the bathing platform
-
The main deck is on one level i.e. no steps
-
Solid Teak decking on the after deck, the sunbathing platform and the stairs to the fly bridge as well as on the side decks and forward deck.
-
A hydraulic gangway with 4 functions is integrated in the stern
-
6 stainless steel cleats - each with a fairlead to protect the warps
-
The stern cleats are installed under a cover in the locker. There is also space for mooring winches (optional extra)
-
There is an integrated seat on the after deck with upholstered cushions and glass holders
-
Electric anchor winch with 75m anchor chain, chain stopper and stainless steel anchor, that can be operated from 3 stations
-
Integrated cushioned sunbathing area on the superstructure with an upholstered seat at the front of it.
-
Escape hatch from the forward cabin
-
Cover for front windscreen
-
2 spacious lockers in the front superstructure
-
A big fender and chain stow space under the front deck and deck-washing connection for freshwater
-
Stainless steel boarding ladder with teak steps
-
Two waterproof loudspeakers integrated in the fly-bridge roof
-
Cockpit and deck lighting in the fly-bridge roof and in the bulwark
-
Stair lighting
-
230V socket in the cockpit
-
GRP table with stainless steel base in the cockpit
-
GRP stairway to the fly-bridge and upper deck with stainless steel sliding hatch
-
Spacious lockers situated in the after deck superstructure
-
GRP- stairs to the bathing platform
-
These stairs can be hydraulically swing open to enable access to the after deck stowage space and the engine room
-
Transom locker houses with two 50 amp shoreline sockets, freshwater connections as well as a fresh-water intake
-
Integrated stern shower (hot and cold)
-
-
Boat equipment:
-
6 mooring ropes
-
8 fenders
-
1 boathook (integrated)
-
2 shore supply cables